Principal Activity

Electricity is a foundation of the economy and vital support of any state. The reliability of the electric power infrastructure ensures the efficiency of the whole energy complex of the country.

Batys transit JSC is the first successful example of public-private partnership in Kazakhstan. Since its formation in 2005 we have implemented:

 - concession project of construction and operation of  North Kazakhstan – Aktobe Region 500 kV inter-regional transmission line (project cost is 188 million $, in operation since 2009);

- investment project of construction and operation of 220 kV electrical power lines, providing the external electricity for the melting workshop No. 4  of Aktobe branch of Ferroalloy Plant, owned by TNK Kazchrome JSC (project cost is 20 million $, in operation since 2013).

These infrastructure facilities are built with use of the borrowed investment s and they are paid off from the tariff for transmission services.

While construction the 500 kV transmission lines, the new advanced technologies were applied:

* installation of the only CIS-located three-phase phase-shifting transformer (with forced flux distribution220/220 kV, 400 MW, to ensure reliable energy sources from the Kazakhstani power generation sources for the consumers of Aktobe region;

*surge arresters SA-500 kV with connection to the 500 kV high-voltage lines, instead of the lightning proof wire, which was used before;

* new method the air tension is applied for suspension of electrical lines due to the use of specialized equipment of the Italian manufacturer -TESMEC SPA, which could accelerate the pace of construction.

Batys Transit JSC gathered a team of highly qualified specialists, having the great potential, unique knowledge and experience!